Pinnacle Ridge Solar and Storage
VELCO selected two leading Vermont Renewable energy companies, Catamount Solar and KORE Solutions to construct VELCO’s Pinnacle Ridge Solar and Storage project at the company’s headquarters in Rutland, Vermont. The project includes a 500kW solar array tied to a 1.2MWh energy storage system designed to reduce VELCO’s energy use at times of high-cost. Catamount Solar was selected as the prime contractor and was responsible for site work and construction of the solar array infrastructure, as well as the site’s power distribution and utility connections. Northern Reliability was responsible for all aspects of the battery energy storage system, including design, component integration and containerization, on-site construction, installation, and testing.